Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
11/10/1943
The year in which a vessel’s construction is completed.
1943
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
R & W Hawthorn Leslie & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Hebburn on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
101646
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
25/07/1942
The individual and/or organisation listed
Houlder Line Ltd
Location where the document is written.
Newcastle on Tyne
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 9,43; 3 DB 125 lbs; CL
Broad categories and subdivisions of vessels related to their purpose or function.
Twin Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
10365
Location of construction for a vessel’s engines.
Newcastle (St Peters)
R & W Hawthorn Leslie & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Hakodate Dock Co Ltd for Breaking up at Hakodate
Physical extent of a record.
1
Name of ship as recorded on the record
Rippingham Grange
The process of transferring a vessel to water, but not necessarily her completion.
06/03/1943
Unique identifier for a given ship, it is assigned by a builder.
653
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4b Report on Oil Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
22/09/1943
Name of the individual/entity/organisation responsible for authoring the record
A Watt; T D Shilston; J E Martin
Location where a vessel’s survey was undertaken.
Hebburn
Date of the meeting of the Classing Committee.
30/11/1943
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Hawthorn Werkspoor Supercharged
Date in which construction of a vessel’s engines were completed.
1943
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Hakodate
Pertinent, useful or interesting recorded content.
Also refers to Vessel Beacon Grange
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.