Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
12/05/1924
The year in which a vessel’s construction is completed.
1924
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J L Thompson & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
77854
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
12/05/1924
Name of the individual/entity/organisation responsible for authoring the record
J Harbottle
Location where a vessel’s survey was undertaken.
Newcastle
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Date in which construction of a vessel’s engines were completed.
1924
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Spezia
Name of ship as recorded on the record
British Duchess
The process of transferring a vessel to water, but not necessarily her completion.
06/03/1924
Unique identifier for a given ship, it is assigned by a builder.
549
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5 Report on Boilers
The date of first visit by a surveyor.
23/10/1922
The individual and/or organisation listed
British Tanker Co Ltd
Location where the document is written.
Newcastle
Date of the meeting of the Classing Committee.
20/05/1924
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Jarrow on Tyne
Palmers Ship Building & Engineering Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Indian Trading Cy Vaduz for Breaking up at Spezia
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.