Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
13/04/1935
The year in which a vessel’s construction is completed.
1936
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Kockums Mekanista Verkstads Aktiebolag
The port or place in which the vessel’s construction took place, at the time of writing.
Malmo
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Malmo 1524
Name of the individual/entity/organisation responsible for authoring the record
Kockums Mekaniska Verkstads A B
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Hendrik Ido Ambacht
Physical extent of a record.
1
Name of ship as recorded on the record
Havkong
The process of transferring a vessel to water, but not necessarily her completion.
31/10/1936
Unique identifier for a given ship, it is assigned by a builder.
192
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Half Midship Section
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Malmo
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to N V Frank Rijsdijk's Ind Ond for Breaking up at Hendrik Ido Ambacht
Recorded information relating the specific cargo being conveyed.
Carrying Petroleum in Bulk
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.