Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/06/1952
The year in which a vessel’s construction is completed.
1952
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Gray & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report on Steam Turbine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
24/06/1952
Location where the document is written.
Newcastle
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See FE Mchy Rpt HPl 19420
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Date in which construction of a vessel’s engines were completed.
1952
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Wrecked
Recorded date for the vessel’s loss or disposal.
05/06/1954
Name of ship as recorded on the record
Evgenia
The process of transferring a vessel to water, but not necessarily her completion.
07/07/1952
Unique identifier for a given ship, it is assigned by a builder.
1254
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Hartlepool 19420
The date of first visit by a surveyor.
18/01/1952
Name of the individual/entity/organisation responsible for authoring the record
John T Findlay; A K Balfour
Location where a vessel’s survey was undertaken.
Walker on Tyne
Date of the meeting of the Classing Committee.
06/01/1953
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
West Hartlepool
Central Marine Engine Works
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Broke, total loss
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.