Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/03/1931
The year in which a vessel’s construction is completed.
1930
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Vereinigte Stahlwerke Alt Nordseewerke Emden
The port or place in which the vessel’s construction took place, at the time of writing.
Emden
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1341b
The listed port to which a given vessel belongs.
Danzig
The date of first visit by a surveyor.
15/01/1931
The individual and/or organisation listed
Baltisch Amerikan Petroleum Import G M B H
Location where the document is written.
Bremen
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See FE Rpt
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Kiel
Fried Krupp Germaniawerf A G
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Laid up, Sold for breaking Up
Name of ship as recorded on the record
J H Senior
The process of transferring a vessel to water, but not necessarily her completion.
14/12/1930
Unique identifier for a given ship, it is assigned by a builder.
173
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bmn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5c Report on Water Tube Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
19/03/1931
Name of the individual/entity/organisation responsible for authoring the record
G H C Bahr
Location where a vessel’s survey was undertaken.
Emden
Date of the meeting of the Classing Committee.
05/05/1931
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
11900
Date in which construction of a vessel’s engines were completed.
1930
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.