Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/03/1928
The year in which a vessel’s construction is completed.
1928
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
C van der Giessen & Zonens Scheepswerf
The port or place in which the vessel’s construction took place, at the time of writing.
Krimpen aan den Yssel
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
F A M; R Leeuwenburg
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking Up
Pertinent, useful or interesting recorded content.
Also refers to Vessel Barendrecht
Name of ship as recorded on the record
Port Vendres
The process of transferring a vessel to water, but not necessarily her completion.
07/11/1927
Unique identifier for a given ship, it is assigned by a builder.
577
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Phs van Ommeren
Location where the document is written.
London; Rotterdam
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.