Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/09/1932
The year in which a vessel’s construction is completed.
1925
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Gray & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
West Hartlepool
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
11b Surveys for Freeboard-Steam Ships
The port in which a vessel is registered or permanently based.
Wellington
Name of the individual/entity/organisation responsible for authoring the record
David K Blair
Location where a vessel’s survey was undertaken.
Wellington
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
The country or national waters where a vessel is lost/disposed of, or last recorded.
Hong Kong
Physical extent of a record.
2
Name of ship as recorded on the record
Kartigi
The process of transferring a vessel to water, but not necessarily her completion.
22/05/1925
Unique identifier for a given ship, it is assigned by a builder.
974
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Wln
Additional numbers that feature on a given record that may be used for identification.
31549
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Wellington
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2347
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking up, Demolition Commenced
Recorded date for the vessel’s loss or disposal.
15/12/1955
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.