Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/11/1951
The year in which a vessel’s construction is completed.
1905
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Blohm & Voss
The country in which the vessel’s construction took place, at the time of writing.
Germany
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
The listed port to which a given vessel belongs.
Lübeck
The individual and/or organisation listed
Reederei Schliewen
Location where the document is written.
London
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque
Type of fuel used onboard a vessel.
Sail - Rigs
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
Yes
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Pamir
The process of transferring a vessel to water, but not necessarily her completion.
07/05/1907
The port or place in which the vessel’s construction took place, at the time of writing.
Hamburg
A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).
825
The country (flag) that a vessel is registered to, at the time of writing.
Federal Republic of Germany
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
Pro Secretary
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo
A vessel’s means of propulsion.
Sail
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2796
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Plan NO MKE 523- Changing and emergency switchboard. Plan no OHbg 3949 Electrical Installation
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.