Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Olive ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
St Catherine ( Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931 )
The process of transferring a vessel to water, but not necessarily her completion.
26/07/1893 ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Unique identifier for a given ship, it is assigned by a builder.
368 ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
Lon ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893 )
The individual and/or organisation listed
Glasgow Dublin & Londonderry Steam Packet Co Ltd ( Steel Steamer Report for Olive, 1st September 1893 1893 )
A A Laird & Co ( Report on Machinery for Olive, 1st September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897 )
J Burnett & Sons ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893 )
Glsgow Dublin & Londenderry Steam Packet Co Ltd ( Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894 )
Glasgow Dubin & Londonderry G P Co (Ltd) ( Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894 )
Glasgow Dublin & Londonderry Steam Packet Co ( Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897 )
Glasgow Dublin & Londonderry S Packet Co ( Report of Survey for Repairs, &c for Olive, 10th June 1896 1896 )
Glasgow Dublin & Londonderry Steam Packet Co Ltd; ( Report of Survey for Repairs, &c for Olive, 4th July 1898 1898 )
Glas Dublin & Londonderry Steam Packet Co; ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898 )
Glo Dub & Lordndy S P Co Ltd; a a Laird & Co ( Report of Survey for Repairs, &c for Olive, 21st June 1899 1899 )
Glo Dub & Lordndy S P Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
N of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd ( Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936 )
Metal Industries Ltd ( Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937 )
Name of surveyor.
James Bradley ( Steel Steamer Report for Olive, 1st September 1893 1893 )
John Sanderson ( Report on Machinery for Olive, 1st September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895 )
Frank Cook ( Ship Forgings Form for Olive, 31st March 1893 1893 )
James H Truscott ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893 )
George E Wilkinson ( Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893 )
Henry Hand ( Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897 )
Charles E Stromeyer ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897 )
A McKeand ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898 )
J W Dimmock ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
John Davey ( Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; LA & CP; +LMC 9,93; 2 Dks (U Stl - ws) ( Steel Steamer Report for Olive, 1st September 1893 1893 )
+LMC 9,93 ( Report on Machinery for Olive, 1st September 1893 1893 )
+100A1 ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897 )
+100A1 8,93; +LMC 8,93 ( Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893 )
+100A1 8,93; +LMC 9,93 ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894 )
100 A1 ( Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894 )
+100A1 7-94; +LMC 9 93 ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895 )
+100A1 8,95; +LMC 9,93 ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896 )
+100A1; 6,96; +LMC 9,93 ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897 )
+100 A1; +LMC 6,98; S S No 1-98 ( Report of Survey for Repairs, &c for Olive, 4th July 1898 1898 )
+LMC 6,98 ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898 )
+100A1; S S 6,99 ( Report of Survey for Repairs, &c for Olive, 21st June 1899 1899 )
S S 6,99 ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
Deferred for complete No 1; BS 7.36 subject ( Report of survey for repairs for St Catherine, 22 September 1936 1936 )
See Abn 18688 ( Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936 )
+100A1 9.35; SS Abn 3rd No 3- 10.31; in red; +LMC 9.35; BS 4.36; +NB 3.11 ( Report of total loss and casualty for St Catherine, 23 June 1937 1937 )
A vessel’s means of propulsion.
Steam ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
undefined ( Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931 )
Is the steamer assisted by sail?
No ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Does the vessel possess an auxiliary power source?
No ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Is electric lighting fitted to the vessel?
No ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Olive, 1st September 1893 1893 )
Triple expansion engine, 3 cylinders ( Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936 )
Date in which construction of a vessel’s engines were completed.
1893 ( Report on Machinery for Olive, 1st September 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
The name of the port/place of destination given.
France ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893 )
Coasting ( Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
Irish Channel ( Report of Survey for Repairs, &c for Olive, 4th July 1898 1898 )
Ireland ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898 )
Rosyth ( Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
A A Laird & Co ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
881 ( Report of survey for repairs for St Catherine, 22 September 1936 1936 )
Used to indicate the capability of early reciprocating steam engines, based on dimensions rather than performance. It is not a true indication of actual engine power.
369 ( Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936 )
The year in which a vessel’s construction is completed.
1893 ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
D & W Henderson & Co ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
The listed port to which a given vessel belongs.
Glasgow ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
London ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
H McDougall ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898 )
J Holmes ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893 )
McDaggart ( Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894 )
McDougall ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896 )
Location where a vessel’s survey was undertaken.
Glasgow ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
Partick Glasgow ( Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893 )
London ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936 )
Aberdeen ( Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Olive, 1st September 1893 1893 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1141 ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
473 ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893 )
1065 ( Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937 )
Is machinery fitted at the aft of the vessel?
No ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Steel Steamer Report for Olive, 1st September 1893 1893, Report on Machinery for Olive, 1st September 1893 1893, Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Report of Survey for Repairs &c for Olive, 6th October 1893 1893, Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893, Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c for Olive, 4th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Location of construction for a vessel’s engines.
Glasgow ( Report on Machinery for Olive, 1st September 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 5th June 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936 )
The name of the yard where the vessel was built.
Meadowside ( Profile & Deck Plan for Olive, 1st January 1893 1893, Plan of Pumping Arrangement for Olive, 22nd May 1893 1893, Midship Section Plan for Olive, 19th January 1893 1893, Report on Electric Lighting Installation for Olive, 7th September 1893 1893, Plan of Main Boiler for Olive, 20th January 1893 1893, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Olive, 28th August 1893 1893, Engine Forgings Form for Olive, 15th May 1893 1893, Ship Forgings Form for Olive, 29th April 1893 1893, Ship Forgings Form for Olive, 31st March 1893 1893, Letter from T Richardson, returning Reports for St Catherine to The Secretary, London, 9th October 1931 1931, Letter from Andrew Scott, Secretary, to The Surveyors, Aberdeen, regarding St Catherine, 9th June 1931 1931, Letter from Roger Brown, Manager of the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd, to the Secretary of Lloyd's Register London, communicating that St Catherine's donkey boiler has not been used for many years and will likely neve 1936, Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 4th Special Survey No 1, 30 September 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936, Report of survey for repairs for St Catherine, 22 September 1936 1936, Report of survey for repairs of engines and boilers for St Catherine, 21 September 1936 1936, Report of total loss and casualty for St Catherine, 23 June 1937 1937, Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Recorded information related to a vessel’s movements.
London; France ( Report of Survey for Repairs &c for Olive, 6th October 1893 1893 )
Glasgow; Coasting ( Report of Survey for Repairs, &c for Olive, 22nd February 1894 1894, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th February 1894 1894, Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894, Report of Survey for Repairs, &c for Olive, 14th August 1895 1895, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 19th June 1895 1895, Report of Survey for Repairs, &c for Olive, 10th June 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th June 1896 1896, Report of Survey for Repairs, &c for Olive, 7th June 1897 1897, Report of Survey for Repairs, &c for Olive, 21st June 1899 1899, Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 28th June 1899 1899 )
Glasgow; Irish Channel ( Report of Survey for Repairs, &c for Olive, 4th July 1898 1898 )
Glasgow; Ireland ( Report of Survey for Repairs, &c, of Engines & Boilers for Olive, 8th July 1898 1898 )
Aberdeen ( Copy of letter from the Clerk to the Classification Committee of Lloyd's Register London, to the North of United Kingdom & Orkney & Shetland Steam Navigation Co Ltd regarding the donkey boiler and partially held survey for St Catherine, 9 October 1936 1936, Report on masts, spars, and rigging for St Catherine, 7 July 1936 1936 )
The port in which a vessel is registered or permanently based.
London ( Report of Survey for Repairs &c of Engines & Boilers for Olive, 6th October 1893 1893 )
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
1141 ( Report of Survey for Repairs, &c, for Olive, 26th July 1894 1894 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
The name of the port/place from which a vessel’s voyage originated.
Aberdeen ( Memo between T A Powell, Lloyd's Register London Office, and John Houston, Surveyor at Leith enquiring as to whether demolition operations have commenced for the vessel St Catherine and the reply that they have, 19 May 1937; 22 June 1937 1937, Memo between Lloyd's Register London Office, and T Richardson, Surveyor at Aberdeen enquiring as to the case of St Catherine, and the reply that she is currently being broken up at Rosyth, 14 May 1937; 15 May 1937 1937 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.