Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
The individual and/or organisation listed
Name of surveyor.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AE1 ( Survey report for Lord Nelson, 31 May 1834 1834 )
AE1; record damage repair ( Report of Survey for Repairs for Lord Nelson, 9th November 1835 1835 )
Cont AE1 ( Annual Surveys Report for Lord Nelson, 14th March 1837 1837 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Survey report for Lord Nelson, 31 May 1834 1834 )
A vessel’s means of propulsion.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
The listed port to which a given vessel belongs.
London ( Report of Survey for Repairs for Lord Nelson, 9th November 1835 1835 )
Bristol ( Annual Surveys Report for Lord Nelson, 14th March 1837 1837 )
The name of the port/place of destination given.
Unknown ( Annual Surveys Report for Lord Nelson, 14th March 1837 1837 )
The year in which a vessel’s construction is completed.
The port or place in which the vessel’s construction took place, at the time of writing.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location where a vessel’s survey was undertaken.
The name of the port/place from which a vessel’s voyage originated.
Physical arrangement of a ship’s masts, sails and rigging.
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Survey report for Lord Nelson, 31 May 1834 1834, Report of Survey for Repairs for Lord Nelson, 9th November 1835 1835, Annual Surveys Report for Lord Nelson, 14th March 1837 1837 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon ( Report of Survey for Repairs for Lord Nelson, 9th November 1835 1835, Annual Surveys Report for Lord Nelson, 14th March 1837 1837 )
Predominant material(s) utilised in a vessel’s construction.
Wood ( Report of Survey for Repairs for Lord Nelson, 9th November 1835 1835, Annual Surveys Report for Lord Nelson, 14th March 1837 1837 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.