Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Barton ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/08/1903 ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

225 ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Form of Postponed Surveys for Barton, 19th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

Location of construction for a vessel’s engines.

Location of engine build

South Shields ( Report on Machinery for Barton, 13th October 1903 1903 )

The port in which a vessel is registered or permanently based.

The year in which a vessel’s construction is completed.

Year of ship completion

1903 ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Rennoldson & Sons ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

South Shields ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Paddle Tug ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Profile & Deck Plan for Barton, 1903 1903 )

Paddle Steamer ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908 )

undefined ( Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Tug ( Midship Section Plan for Barton, 1903 1903 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Letter from Bernard C Laws, to The Secretary, London, regarding Barton, 28th October 1903 1903, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Barton, 24th October 1903 1903, Steel Steamer Report for Barton, 23rd October 1903 1903, Copy of Letter from Secretary, to The Surveyors, Newcastle on Tyne, regarding Barton, 28th October 1903 1903, Report on Machinery for Barton, 13th October 1903 1903, Plan of Multitubular Boilers for Barton, 26th March 1903 1903, Profile & Deck Plan for Barton, 1903 1903, Midship Section Plan for Barton, 1903 1903, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Memo regarding classification for Barton, 30th December 1908 1908, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding SS No 1 for Barton, 22nd December 1908 1908, Copy of Letter from Secretary, to The Manchester Ship Canal Co, Manchester, regarding Barton, 31st December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 19th December 1908 1908, Letter from F A Eyre, Secretary, to F W Pitt Esq, Lloyd\'s Register of British & Foreign Shipping, Salford, regarding Barton, 18th December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 8th December 1908 1908, Form of Postponed Surveys for Barton, 7th December 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 3rd December 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 2nd December 1908 1908, Form of Postponed Surveys for Barton, 19th November 1908 1908, Letter from F W Pitt, to The Secretary, regarding Barton, 16th November 1908 1908, Copy of Letter from Secretary, to The Surveyors, Manchester, regarding Barton, 6th November 1908 1908, Report of Survey for Repairs, &c for Barton, Undated no date )

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Recorded information related to a vessel’s movements.

Voyage information

South Shields; Manchester ( Steel Steamer Report for Barton, 23rd October 1903 1903 )

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Side Lever Disconnecting ( Report on Machinery for Barton, 13th October 1903 1903 )

Date in which construction of a vessel’s engines were completed.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.