Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
01/10/1875
The year in which a vessel’s construction is completed.
1865
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Richardson, Duck & Co
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c.
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Iron 11572
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
01/10/1875
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
S Jeffares
Location where the document is written.
Hartlepool
Location where a vessel’s survey was undertaken.
Hartlepool
Date of the meeting of the Classing Committee.
12/10/1875
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Lord Byron
The process of transferring a vessel to water, but not necessarily her completion.
25/07/1865
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
15223
Additional numbers that feature on a given record that may be used for identification.
Hartlepool 3525
The listed port to which a given vessel belongs.
Dublin
The date of first visit by a surveyor.
07/08/1875
The individual and/or organisation listed
Palgrave & Co
Name of the individual/entity/organisation responsible for authoring the record
Samuel P Gladstone; James L Sinnette
Name of surveyor.
Samuel P Gladstone; James L Sinnette
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AA1; S S no 3-75; Drp 75; Lloyds MC
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
758
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.