Date recorded as the time of writing.
20/04/1960
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Earle's Shipbuilding & Engineering Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Hull
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13332
The port in which a vessel is registered or permanently based.
Fort William, Ontario
The date of first visit by a surveyor.
17/12/1959
The individual and/or organisation listed
N M Paterson & Sons Ltd
Location where the document is written.
Montreal
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred For Comp; ES; But Assign MBS 2,60
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1831
Date in which construction of a vessel’s engines were completed.
1927
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Thordoc
The process of transferring a vessel to water, but not necessarily her completion.
17/05/1927
Unique identifier for a given ship, it is assigned by a builder.
670
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mtl
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Periodical Surveys & Repairs of Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
13/04/1960
Name of the individual/entity/organisation responsible for authoring the record
D McKinnon
Location where a vessel’s survey was undertaken.
Montreal
Date of the meeting of the Classing Committee.
09/05/1960
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
T 3 Cylinders
Earle\'s Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No