Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/01/1936
The year in which a vessel’s construction is completed.
1936
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
N V Verschure & Co's Scheepswerf en Machinefabriek
The port or place in which the vessel’s construction took place, at the time of writing.
Amsterdam
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 2229; 2230; 2231; 2232 CHLP
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
08/01/1936
Location where the document is written.
Grimsby
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
H Widdop & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1936
Pertinent, useful or interesting recorded content.
Engine Forgings No F3499; Manufactured by Clarke\'s Crank & Forge Co Ltd of Lincoln
Name of ship as recorded on the record
Anglo No 14
The process of transferring a vessel to water, but not necessarily her completion.
11/03/1936
Unique identifier for a given ship, it is assigned by a builder.
207
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Engine Forgings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Manchester 8551; Amsterdam 13656
The date of first visit by a surveyor.
09/12/1935
Name of the individual/entity/organisation responsible for authoring the record
C H L Pilditch
Broad categories and subdivisions of vessels related to their purpose or function.
Barge
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Keighley
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1936
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.