Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/02/1912
The year in which a vessel’s construction is completed.
1912
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Jos T Eltringham & Co
The port or place in which the vessel’s construction took place, at the time of writing.
South Shields
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
61924
The listed port to which a given vessel belongs.
Grimsby
The date of first visit by a surveyor.
14/12/1911
The individual and/or organisation listed
Great Central Railway Co
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
South Shields
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
North Shields
Baird Bros
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Central No 2
The process of transferring a vessel to water, but not necessarily her completion.
02/02/1912
Unique identifier for a given ship, it is assigned by a builder.
287
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
05/03/1912
Name of the individual/entity/organisation responsible for authoring the record
George Murdoch; C J Hudson
Name of surveyor.
George Murdoch
Date of the meeting of the Classing Committee.
15/03/1912
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
137
Date in which construction of a vessel’s engines were completed.
1912
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.